ISO, Buzz, Boss, & Spice Discussion Forums
Home PageHome Page : Events & Fixtures : the quality supervision department
  You are currently not logged in. You can view the forums, but cannot post messages. | Log In | Register | Search | Help |   Refresh Refresh
Post a Reply on This Topic Post a Reply on This Topic

Author Topic: the quality supervision department
dreamgofashion Posted: 16-May-18 09:24
  Edit Edit
 
Email the Author Mail   View Author's Profile Profile  
Wood processing workshops, paint polishing workshops also set limits for the concentration of monitoring points for unorganized particle emissions. The Opinions also stipulates that all painting workshops should maintain a relatively closed environment when performing painting operations,
and each painting station must be equipped with a closed exhaust system. During the painting operation of a closed painting shop, it is not allowed to open the door at random for reasons of handling the goods. , windows; the use of water curtains and other processing facilities to ensure that at least 10 minutes.
after the end of the painting operation can be closed.The quality supervision department sampled 21 batches of unqualified children's furniture in 8 batches for the production of Wan, and the quality supervision department sampled 21 batches of unqualified children's furniture in 8 batches for the production of Wan,
Related links:
[url=http://youtube.ieeejamiahamdard.org/fence/3547-Attaching-Wood-Fence-t
o-Concrete-Wall.html
]Attaching Wood Fence to Concrete Wall[/url]

[url=http://khanapeenaindianfood.com/wall-panel/3160.html]fencing costs calculator[/url]

[url=http://skyhighbuilders.in/garden-fence/3591-garage-roof-designs-in-th
e-philippines.html
]garage roof designs in the philippines[/url]
 

Post a Reply on This Topic Post a Reply on This Topic